News Details


Do you know what the operating procedures of the customized vertical driling machine are?

2021-06-29


In order to make better use of the existing mechanized equipment, improve the performance of the mechanized equipment to play its good role. So let’s take a look at the operating procedures of the customized vertical driling machine!
1. Preparations before starting up
1. Carefully check whether the parts of the customized vertical driling machine are complete.
2. Whether the screws are loose.
3. Whether the lubricating oil meets the required position.
4. Whether the control buttons are flexible and reliable.
5. Whether the drill pipe and bit are damaged.
6. Whether the supporting hole frame is broken.
7. Whether the spray facilities are installed in place.
2. Normal boot
1. The customized vertical driling machine idling for 1 to 2 minutes, carefully listen for abnormal noises and noises.
2. Slowly drill the eyes at low speed.
3. If there is no abnormality in the low-speed gear and there is no gangue in the coal seam, the drilling speed can be adjusted appropriately. If the coal seam always contains gangue and the hardness of the gangue is relatively high, only the low-speed gear can be used for drilling.

Contact us

Dalian Haidi Machinery Co.,Ltd

Address:No.9 Haifu road,

Bonded area,Dalian,China
Telephone: 86-18841132208 
E-mail: info@haidimachine.cn
Website: http://www.dlhaidi.cn

Copyright © 2018 Dalian Haidi Machinery Co.,Ltd.